PROJECT LIST  

Gas Metal Arc Welding (GMAW) 

Project Number Skill Completion Date Course Completion 

STEEL—12 GAUGE 

Short Circuit 

Surfacing 

 1. Flat (1F) .......................................................................................................................... 2%   2. Horizontal (2F)................................................................................................................ 3%   3. Vertical (3F) ............downward ....................................................................................... 5%   4. Overhead (4F) ................................................................................................................. 7%  

Lap Joints 

 5. Flat (1F) .......................................................................................................................... 8%   6. Horizontal (2F).............................................................................................................. 10%   7. Vertical (3F) ............downward ..................................................................................... 12%   8. Overhead (4F) ............................................................................................................... 13% 

Updated 8-11-23  

WLDG 1430: Introduction to GMAW and FCAW Page 19 

Tee-Joints 

9. Flat (1F) ........................................................................................................................15% 10. Horizontal (2F)..............................................................................................................17% 11. Vertical (3F)............downward and upward.................................................................18% 12. Overhead (4F)...............................................................................................................20% 

Plate to Pipe Fillets – Multi-pass welds, minimum of three passes each. Sch. 10, 1 ½” – 4”  dia. pipe, based on availability. 

13. Horizontal (2F)..............................................................................................................22% 14. Overhead (4F)……. ......................................................................................................23% 15. Fixed Horizontal Pipe Axis (5F) …….downward and upward ....................................25% 

Plug Weld Joints  

16. Flat ...............................................................................................................................27% 17. Horizontal ....................................................................................................................28% 

STEEL—1/4” Plate or heavier based on availability 

Cutting (Students will cut specific sized pieces with a ± 1/16 Tolerance including bevels) 

18. OFC Manual Torch ......................................................................................................30% 19. Manual PAC..................................................................................................................32% 

STEEL—1/4” Plate or heavier based on availability 

Lap Joints - Short Circuit 

20. Flat (1F) ........................................................................................................................33% 21. Horizontal (2F)..............................................................................................................35% 22. Vertical (3F)............upward..........................................................................................37% 23. Overhead (4F)...............................................................................................................38% 

Tee-Joints - Short Circuit 

24. Flat (1F) ........................................................................................................................40% 25. Horizontal (2F)..............................................................................................................42% 26. Vertical (3F)............upward..........................................................................................43% 27. Overhead (4F)...............................................................................................................45% 

Spray Transfer Tee-Joints ¼” and Heavier  

28. Horizontal (2F)..............................................................................................................47%

Updated 8-11-23 

WLDG 1430: Introduction to GMAW and FCAW Page 20 

Pulse Spray Transfer Tee-Joints ¼” and Heavier  

 29. Vertical (3F) ..............upward.......................................................................................... 48%   30. Overhead (4F) ................................................................................................................ 50%  

Flux Cored Arc Welding (FCAW-G)

  

STEEL—1/4” Plate or heavier based on availability  

Tee-Joints 

 31. Flat (1F) ........................................................................................................................ 52%   32. Horizontal (2F).............................................................................................................. 53%   33. Vertical (3F) ...........upward.......................................................................................... 55%   34. Overhead (4F) ............................................................................................................... 57%  

Flare Bevel 

 35. Horizontal (2G) ............................................................................................................. 58%   36. Vertical (3G) ...........upward ....................................................................................... 60%   37. Overhead (4G) .............................................................................................................. 62%  

Flare Vee 

 38. Vertical (3G) ...........upward.......................................................................................... 63%   39. Overhead (4G) 65%  

V-Groove With Backup 3/8” Minimum plate or heavier (Donated Materials If Possible) 

 40. Flat (1G) ........................................................................................................................ 67%   41. Horizontal (2G) ............................................................................................................. 68%   42. Vertical (3G) ...........upward……….Bend Test Required ....................................... 70%    

Flux Cored Arc Welding (FCAW-S)

  

STEEL 

Lap Joints 

 43. Flat (1F) ........................................................................................................................ 72%   44. Horizontal (2F).............................................................................................................. 73%   45. Vertical (3F) ............downward/upward........................................................................ 75%   46. Overhead (4F) ............................................................................................................... 77% 

Updated 8-11-23  

WLDG 1430: Introduction to GMAW and FCAW Page 21 

Tee-Joints 

 47. Flat (1F) ........................................................................................................................ 78%   48. Horizontal (2F).............................................................................................................. 80%   49. Vertical (3F) ............downward/upward........................................................................ 82%   50. Overhead (4F)……… ................................................................................................... 83%  

V-Groove Open Root 1/4” Minimum plate or heavier (Donated Materials If Possible) 

 51. Flat (1G) ........................................................................................................................ 85%   52. Horizontal (2G) ............................................................................................................. 87%   53. Vertical (3G) ...........upward………Bend Test Required…………………………....88 %    

Gas Metal Arc Welding (GMAW) 

ALUMINUM – 1/4” Plate or heavier based on availability  

Lap Joints 

 54. Flat (1F) ........................................................................................................................ 90%   55. Horizontal (2F)..............................................................................................………… 92%   56. Vertical (3F) ............downward ..................................................................................... 93%   57. Overhead (4F) ............................................................................................................... 95%  

Tee-Joints 

 58. Flat (1F) ........................................................................................................................ 97%   59. Horizontal (2F).............................................................................................................. 98%   60. Vertical (3F)…downward ......................................................................................... 100%  


Readings

Jeffus, Larry, Welding: Principles and Applications, Delmar Publishers, Inc., current edition.  


Course Subjects

Gas Metal Arc Welding (GMAW)

Surfacing

Lap Joints

Tee-Joints

Plate to Pipe Fillets – Multi-pass welds, minimum of three passes each. Sch. 10, 1 ½” – 4”  dia. pipe, based on availability

Plug Weld Joints


Student Learning Outcomes/Learning Objectives

Course Learning Outcomes 

Describe welding positions with various joint designs; describe the effects of welding  parameters in GMAW; apply safety rules; troubleshoot equipment used; perform visual  inspection; weld various types of structural material; diagnose welding problems.


Office Hours

M 6:25 PM - 7:25 PM 5131

NOTE Office hours: Saturday 7:00am-8:00am Monday 6:25pm-7:25pm

S 7:00 AM - 8:00 AM 5132

NOTE Office hours: Saturday 7:00am-8:00am Monday 6:25pm-7:25pm

Published: 01/19/2026 18:58:09